MachinoX Pro - Production Monitoring System

Andon solutions / Cloud Andon

Cloud Andon tower light Visual signals on the line, real-time status in the cloud

The Cloud Andon Tower Light is a visual signalling device for industrial environments. It uses cloud technology to share real-time status updates and customisable visual alerts, so everyone in the plant works from the same picture.

Call now
Cloud Andon tower lights on machines across a smart factory, connected over Wi-Fi to a cloud server, with live machine status on a laptop, tablet and phone. Around them, close-ups of the wireless gateway, the multi-colour LED tiers, an audible alarm, a tower light in water spray, control from a phone, mounting on a machine, a modular stack and an energy-saving symbol.
Tower lights report to the cloud over the plant's wireless network; live status on laptop, tablet and phone.Open full size
Wireless communication
Wi-Fi + Bluetooth
Red, green, blue, yellow, white
5 colours
Dust tight, water-jet protected
IP65
Operating temperature
-20 to 60°C

01How it works

How a cloud Andon tower light works from the station to your screen

Three steps take a status change from a light on the machine to the people who need to act on it.

  1. 01

    Signal at the station

    Multi-colour LEDs and customisable alarms show each machine's status where the work happens, in colours the whole area can read.

  2. 02

    Status to the cloud

    The tower light connects to your existing network over Wi-Fi or Bluetooth and sends every status change to the cloud in real time.

  3. 03

    Visible anywhere

    Supervisors follow live status, downtime and OEE on a laptop, tablet or phone, and manage the tower light remotely.

02Features

Key features of the cloud Andon tower light

Built for the shop floor, managed from the cloud.

  • 01

    Wireless connectivity

    Connects to your existing network for instant communication, with no signal cabling to run.

  • 02

    Multi-colour LED light

    A clear range of colours for intuitive visual cues the whole area can read.

  • 03

    Customisable alarms

    Program specific lights and sounds for different situations, so every call gets the right response.

  • 04

    Durable construction

    Built to withstand challenging industrial conditions, for long, reliable service.

  • 05

    Remote control

    Manage the tower light remotely for effortless customisation and monitoring.

  • 06

    Modular design

    Choose the number of light tiers and colours each station needs.

  • 07

    Easy installation

    Quick setup on machines, workstations or assembly lines, with versatile mounting options.

  • 08

    Energy-efficient

    LED technology keeps power consumption low, reducing operating costs.

03Cloud reports

Reports in the cloud downtime, OEE and efficiency

Every signal is recorded, so the same events become reports your team can review by machine, shift and date.

Downtime report on a laptop: a Pareto of minutes of downtime by reason for all machines, above a table of downtime events with start time, duration, machine, reason and whether it was planned

04Specifications

Technical specifications

One tower light, five LED colours, IP65 protection.

01Power
110–240V
02Communication
Wireless (Wi-Fi, Bluetooth)
03LED colours
Red, Green, Blue, Yellow, White
04Operating temperature
-20°C to 60°C
05IP rating
IP65 (dust tight and protected against water jets)
06Dimensions
Height 1.5 m, base diameter 30 cm

05Use cases

Use cases of the cloud Andon tower light

Anywhere a status has to be seen on the floor and followed from elsewhere.

  • 01

    Manufacturing

    Ideal for assembly lines, to indicate production status, quality checks or machine malfunctions.

  • 02

    Warehouses

    Enhances inventory management by signalling low stock, order fulfilment and shipping alerts.

  • 03

    Logistics

    Improves supply chain efficiency by signalling loading and unloading status and delivery schedules.

  • 04

    Health and safety

    Provides visual warnings during emergencies or safety protocol breaches, for a swift response from personnel.

  • 05

    Customisable applications

    Can be tailored for industries such as automotive, electronics and food processing, to meet specific operational needs.

06Related products

Related products across the Andon range

Other ways to signal and track status on the shop floor.

07Get started

Book a free trial of the Cloud Andon Tower Light

See the tower light and its cloud reports working with your own machines, or call us to talk your line through first.

Call nowContact us

Latest from the MachinoX Pro blog

View all articles